ERP FOR CONSTRUCTION

Projects more measurable, budgets more controlled.

ERPAISYS helps construction companies connect cost estimates, budgets, project activity, and actual costs in one easy-to-monitor Project Management system.

Schedule a Demo → View Cost Estimate ↓
Project Overview · Cendana Office BuildingOn Track
ESTIMATE VALUERp 8.50 B
ACTUALRp 3.06 B
PROGRESS36%
Budget utilizationRp 3.06 B / Rp 8.50 B
Work progress36% · on schedule
EstimateStructureArchitectureHandover
CONSTRUCTION BUSINESS CHALLENGES

As projects grow, control can't fall behind.

Estimate documents, costs, and field activity often run separately. ERPAISYS brings them together so management always sees the real condition of the project.

01

Complex cost estimating

Materials, labor, equipment, overhead, and subcontracted work must be organized neatly per task. Price or volume changes can make estimates hard to maintain.

02

Budget calculations are hard to control

Project budgets need to be broken down to cost centers and activities. Without comparing plan versus actual, potential overbudget only becomes visible too late.

03

Project activity isn't monitored

Field progress, resource usage, and work obstacles need consistent updates so decisions don't rely solely on manual reports.

STRUCTURED COST ESTIMATE

Start every project with an estimate that's organized and traceable.

Prepare a Cost Estimate (RAB) based on a Work Breakdown Structure (WBS). Each work item can hold quantity, unit price, and cost components to build the project’s estimated value transparently.

  • ✓Group work from foundation, structure, and architecture to MEP and finishing work.
  • ✓Enter material, labor, equipment, and subcontractor needs for each work item.
  • ✓Use the cost estimate as the basis for budgeting, procurement, and cost evaluation throughout the project.
Cost Estimate · Office Building ProjectVersion 02 · Approved May 18, 2026
Approved
Work item
Volume
Estimated value
Site preparation & earthworks
1 LS
Rp 640,000,000
Concrete structure
720 m³
Rp 2,850,000,000
Architecture & finishing
4,200 m²
Rp 2,340,000,000
MEP & utilities
1 LS
Rp 1,910,000,000
Total Cost Estimate
Rp 8,500,000,000
BUDGET CONTROL

Turn a cost estimate into a budget that's ready to control.

Allocate budget value to project phases, activities, or cost centers. Actual spending from purchases, stock, timesheets, and other costs can be compared directly against the plan.

Plan vs actual by phase

Monitor fund usage, remaining budget, and variance before they affect project profit.

Work phase
Budget
Actual
Variance
Preparation
Rp 640 M
Rp 590 M
+ Rp 50 M
Structure
Rp 2.85 B
Rp 1.76 B
+ Rp 1.09 B
Architecture
Rp 2.34 B
Rp 710 M
+ Rp 1.63 B
MEP & utilities
Rp 1.91 B
Rp 0
+ Rp 1.91 B

Control that fits every project

Budget isn't just recorded at the start. ERPAISYS helps teams keep every change visible and accountable.

  • Set budgets per project, phase, activity, or accounting dimension.
  • Revise budgets with documented versions and approval workflows.
  • See budget committed from purchase orders before costs become actual.
  • Analyze variance to identify work areas that need early action.
PROJECT ACTIVITY MONITORING

Monitor field activity without waiting for end-of-day reports.

Every activity, work hour, and progress update recorded by the field team is instantly visible to the project manager, without manual recap.

Project Activity · Floor 1 Structure

Last updated: today, 15:30
Task
Assigned to
Status
Progress
Column reinforcement grid A-D
Structure Team 01
In Progress
72%
Floor 1 beam concrete pour
Structure Team 02
Scheduled
0%
Concrete quality inspection
Field QC
Waiting
−
Steel material delivery
Procurement
In Progress
85%

Today's activity

07.30 · Safety (K3) checklist completedAll teams report the area is safe
09.15 · Material arrives on siteSteel & cement received, recorded into project stock
13.00 · Daily progress entered4 activities logged by the field supervisor
16.45 · Daily report sentAutomatically forwarded to the project manager
S-CURVE PROJECT MONITORING

One curve to see the whole project's progress.

The S-Curve compares planned and actual progress over time, so deviations can be identified and addressed quickly.

Plan vs Actual

Project S-Curve · Cendana Office Building

PlanActual
-8% from plan
01

Compare progress over time

Planned and actual progress percentages are shown on the same curve.

02

Detect delays earlier

The gap between plan and actual is visible before it affects the project deadline.

03

Ready to share with stakeholders

The S-Curve can be exported for weekly reports to clients and management.

INTEGRATED WORKFLOW

From cost estimate to evaluation, in one workflow.

Every project stage is connected, so teams don’t need to switch systems to see the full picture of the project.

1

Prepare Estimate

Cost estimates per work item, organized based on WBS.

2

Set Budget

The estimate becomes a controlled budget per phase and cost center.

3

Plan Tasks

Project activities and schedules are organized for each work team.

4

Record Actuals

Progress, work hours, and actual costs are recorded from the field.

5

Monitor & Evaluate

Variance and the S-Curve are monitored for decision-making.

Build construction projects that are more measurable and controlled.

Manage cost estimates, budgets, activities, and project progress in one connected system.